E-site® Case Study
This E-site® case study is based on information from a Flexenclosure Renewable Energy site solution in Africa.
A vast amount of data and performance statistics has been derived from the real-time intelligent control and management system, Diriflex® which is part of the E-site®. Presented below are the main conclusions from a six month measuring period on a trial site with an average total power requirement of 1.4 kW.
Download Case Study on E-site®
Back